Pricing and timelines

What determines the cost of website development

At Amidcode a corporate website runs from $1,000 to $4,000 depending on the tier. The lower end buys a quality template adapted to your brand, your list of services and your content. The upper end buys custom design with animation, a branched structure and integrations with the systems your company already uses. Quotes under a thousand dollars almost always mean a template with no adaptation, while anything above four thousand starts to resemble a web application with user accounts and record keeping.

Inside that range the number comes down to four things: the size of the structure, the depth of the design work, what the site has to do beyond showing pages, and who prepares the text and the photography. Below we take each part separately and list the costs that appear after launch.

Price tiers and what each one covers

Before the details, a look at the whole picture. These are the corporate website tiers our studio works with.

Tier Timeline Price
Template website from 2 to 3 weeks from $1,000 to $2,000
Corporate website from 1 to 2 months from $2,000 to $3,000
Premium website from 2 to 3 months from $3,000 to $4,000
Premium with SEO and Google Ads from 3 months from $4,000

The first tier suits a company that needs a working site with a sane structure and lead forms fairly quickly. The second covers what most service businesses are after. The third gets chosen when the site itself has to make an impression through a complex home page, custom blocks and considered animation. The exact figure is calculated for the specific project, because two companies from the same industry arrive with very different demands on structure and features. You can see examples of corporate websites we have built and request a quote for your own project on the corporate website development page.

What builds the number in an estimate

Clients tend to think about a website as a number of pages. An agency counts differently, and most of the confusion over budgets starts right there.

Structure size and the number of unique layouts

An estimate is built around unique layouts, meaning pages with a different type of markup. A catalog with a long product list and a small catalog cost the same, because the product card is designed once and then filled with data. An About page with a team block, a story about the production floor and a photo gallery counts as a separate layout.

A typical page set for a company selling services looks like this.

  • Home page with a short description of your directions, proof of competence and a lead form.
  • Service page built on a single template that then repeats for every direction.
  • Case list and case page, if you show completed projects.
  • About the company with the team, certificates and photographs of production.
  • Contacts with a map, company details and a feedback form.
  • Blog with a list of publications and an article page.

Every extra unique layout adds work for the designer and the developer. When the structure gets thought through before design starts, surplus layouts never appear. We covered the choice between a single page and a full structure in the piece on landing page or multi-page website.

Template or custom design

A ready template saves the designer’s time and part of the markup work. You get a predictable result in two or three weeks, with your brand colors, your photographs and rewritten blocks. The limitation sits in the template structure, set in advance, so your content has to be fitted into it.

Custom design starts with a prototype where blocks are arranged around your services and your arguments. The designer draws every screen, agrees it with you, then prepares the mobile and tablet versions. That adds anywhere from one week to several, and it creates the gap between the first and second tier in the table above.

Features and integrations

A lead form that sends an email is included in the base price of any website. Costs climb once that same lead has to land in a CRM with the correct source attached, a manager has to receive a messenger notification, and the customer a confirmation letter.

Items that usually appear as separate lines in an estimate:

  • passing leads into a CRM with the source and the ad campaign tagged;
  • online payment and invoice generation;
  • pulling products, stock levels or prices from an accounting system;
  • a price calculator with its own logic;
  • a customer or dealer account area with order history;
  • delivery integration with shipping cost and tracking, through a national carrier.

Separate modules and API connections cost from $500 to $2,000 with us. Once there are many integrations and the systems need two-way synchronization, the project moves into custom development and gets priced closer to a web application budget.

Text, photography and translations

Content is the most common reason a project stalls. Design is ready, the developer sits idle, and there are no service descriptions, because nobody inside the company ever wrote them. The project waits for your materials, or the studio produces the text for a separate fee, and the budget shifts in both cases.

Photography follows the same pattern. Stock shots of somebody else’s office undercut the impression of a company that sells complicated services. A shoot covering production, the team and the products gets paid for separately and planned in advance, since it takes a full day and decent light. Every additional language version adds a line of its own: translation, a layout check for longer strings, multilingual setup inside the CMS.

Why similar looking websites cost different amounts

Two proposals can describe an identical list of pages and differ twofold in price. The gap almost always sits in things nobody sees on the first screen.

The invisible part of the job

A website can be assembled from builder blocks in a few days. It will look acceptable and run slowly, because it drags a pile of unused code along with it. Work on speed means compressing images, setting up caching, clearing out scripts, checking the result on a weak mobile connection. This part stays invisible and is always present in the more expensive quote. We explained separately why a website loads slowly.

A cheap site often ships in a state where changing a line of text requires a programmer. The more expensive option comes with a configured CMS where you add a service, change the phone number in the header and upload a new case yourself. The difference in the estimate amounts to a few days of work, and the saving stretches over years.

A few more items where proposals diverge in price:

  • tablet and wide monitor layouts alongside the usual phone and laptop;
  • basic search optimization, meaning headings, structured data, a sitemap and speed;
  • analytics and goal setup, so leads can be counted per advertising channel;
  • testing across browsers and on real devices, including older phones;
  • migrating the old site with redirects, so search positions survive the move.

How timelines connect to the budget

A timeline reflects the volume of work. Two or three weeks for a template site and two or three months for a premium one are different quantities of man hours, so the price differs several times over. An attempt to halve the schedule usually raises the cost, because more people have to work in parallel.

Deadlines slip from the client side more often than from anywhere else. Design approval drags on because several people make the decision and each of them adds edits at their own stage. Text arrives in pieces. Appoint one person on your side who approves decisions, and collect the materials before design starts. We laid out the schedule stage by stage in the article on how long website development takes.

Costs that appear after launch

The project budget does not end on the day the credentials change hands. The site keeps living, and running it carries a price worth planning alongside development.

  • Domain and hosting. For a service site the sums stay small, for a loaded store they become noticeable.
  • Updates and security. The CMS and its plugins release updates constantly. A site that stands a year without them turns into an easy target for automated attacks.
  • Small edits. A new person in the team section, a new service, a price change, a seasonal banner on the home page.
  • Growth. Sections, calculators and integrations you discover a need for once the site is running.

One-off edits we bill hourly, from $20 an hour, when tasks come up irregularly. A technical plan with updates, backups, monitoring and a monthly report starts at $400 a month. Active projects take a package of hours, for example forty hours a month from $800, with unused hours partly rolling over. What each option covers is laid out on the project support and development page.

Where the budget gets wasted

Across years of work we keep seeing the same mistakes in companies of any size.

The brief stays too general

The phrase “we need a modern website” hands the contractor freedom to invent the task for you. Budget goes into animating the first screen, while the leads come from a clear service catalog and a form visible without scrolling. Start with the question of what a visitor should do on the site, and the estimate becomes far more transparent.

Features get built for later

A customer account that will come in handy someday, a page builder nobody will open, several language versions for a company working in one region. Each of those lines gets paid for now and pays back at some undefined point. Launching a basic version and adding features once a real need appears costs less.

The choice comes down to the lowest price

A quote at half the market rate almost always means one of these: a template with no adaptation, absent testing, work without a contract, a contractor who disappears the moment payment clears. Rebuilding such a site costs more than doing the job properly the first time. We collected the signs of a reliable contractor in the material on how to choose a web agency.

We break the estimate down by project type in separate articles on landing page cost, the online store estimate and what support includes and costs. Each budget line is shown there in more detail.

Conclusions

The price of a website is made up of structure size, design depth, features and content preparation. Change any of those parts and the number in the estimate moves with it. So the question of how much a website costs, asked without a description of the task, has only one honest answer, and that answer is a range.

  • A corporate website comes to roughly $1,000 to $4,000 depending on the tier.
  • A template adapted to your brand takes two or three weeks, a custom project a month and up.
  • Integrations with a CRM, payments and accounting get priced separately and can double the budget.
  • Text and photography have to be prepared in parallel with design, otherwise the project stands still.
  • Add hosting, updates and support to the first year budget, from $400 a month for a plan.

Before talking to a contractor, write down which pages you need and which systems the site has to exchange data with. With that list in hand you receive comparable proposals instead of three numbers pulled out of the air. We prepare a preliminary estimate free of charge. Describe your task on the corporate website development page, and we will come back with a quote and a schedule.

Any questions left?

Leave a request and we will get back to you shortly

    Preferred contact method:
    *Required field
    By clicking the button, you confirm that you have read our Privacy Policy