Handover day is one working day when you and your contractor walk through the finished project and take possession of everything that makes the site yours: access credentials, source files, documents. If that day is a mere formality, a couple of weeks later you may find out that only the developer has the hosting password, the design files sit in somebody’s personal account, and form inquiries land in a mailbox nobody opens.
The checklist suits a landing page, a corporate site and an online store. For a store, it adds checks of the catalog, payment and delivery. None of it requires reading code. Set aside a working day, and avoid signing off the same morning you first see the site.
What you are actually accepting
Owners tend to reduce the handover to one question, “does the site open?”. It almost always opens, so the view has to be wider. A project consists of three parts, and each can fail on its own.
- The site itself. Pages, texts, images, forms, cart, mobile version. Everything your customer sees and does.
- Access and ownership. Domain, hosting, control panel, business email, analytics, payment dashboards. All of it registered to your company.
- Project materials. Source code, a copy of the database, design files, an administrator guide, a list of connected services.
The first part is usually in order, because it gets prepared for the demo. Problems hide in the second and third, and surface months later, when you have already parted ways with the contractor. That is why handover day starts with access.
The normal timeline for a project like yours is in our article on how long website development takes. A project delivered much earlier than planned deserves a closer inspection.
Access without which the site is not yours
Mistakes in this part of the list cost the most. A site can be rebuilt, while a domain registered to an outside person takes months to get back. Verify every item personally, with your own password and from your own computer, while the developer is available.
Domain
The domain has to be registered to your company or to you personally. Log in to the registrar with your credentials and look at the owner contact details. If the agency is listed there, ask for the domain to be moved into your account before anything is signed. Check the renewal date and turn on auto-renewal. If the domain expires, both the site and the email on it stop working.
Hosting and business email
You need access to the hosting panel separately from the site admin area. The panel holds files, the database, mailboxes, certificates and backups. Ask to be shown where backups are switched on. Test the mail on your domain there too. Write to the address from the contacts page and confirm the message arrives and stays out of spam.
Admin area and user accounts
Create an account for yourself with administrator rights and log in with it. Then open the list of users and find out who each one belongs to. Temporary freelancer logins, test users with simple passwords and forgotten intern accounts are among the most common ways in for attackers. Everything unnecessary gets deleted while a person who remembers each account is around.
Third-party services and payment dashboards
Together with your developer, list everything connected to the site: analytics, maps, live chat, email marketing, card payments, couriers, ad accounts. Next to each service, note the account it is registered to, and that account has to be yours. The most frequent trap is analytics set up on the agency’s email address, so when you change contractors you lose access to the whole history of visits.
Checking the site through a visitor’s eyes
Now open the site the way a customer will: in a private browsing window, without administrator rights, and from a smartphone on mobile data. The developer’s laptop with its saved cache is no good here.
- Every page in the menu. Go through every item in the top menu and in the footer. Empty sections, duplicates and placeholders along the lines of “text coming later” show up in a few minutes.
- Forms. Fill in every form with real data. The message has to reach your working mailbox, and no developer address should remain in the settings.
- Phone numbers and messaging apps. Tap the number on a smartphone, check the chat buttons, the links to your social accounts and the map with directions.
- Company details. Legal name, registration data, address, opening hours, shipping and returns terms. Customers are the first to notice errors in these details.
- Mobile version. Repeat on the phone the path you took on the computer. Watch the tables, the long headings and the menu that covers the content.
- Site search. Type a product or service name and see whether the site finds the right page. If typo-tolerant search was part of the contract, try a misspelled name as well.
Collect everything you find in one document: page link, short description, screenshot. Scattered chat messages get lost, and some fixes are never completed.
The technical part that is easy to miss
These items are invisible on the screen, but they decide whether search engines find you, whether the site loads fast and whether you see leads in your analytics. The check takes half an hour, and skipping it costs months. A deeper pass over the same layer is what a website audit does, with every finding written down and ranked.
Security certificate and duplicate addresses
The site has to open only over the secure https address. Check every version of the address: with www and without, with http and https. The extra ones have to redirect to one main address, so that search engines do not see several copies of the site. Look at the certificate expiration date as well.
Visibility in search
At handover, check that robots.txt allows crawlers to access public pages and that any noindex directives added during development have been removed from those pages. A URL blocked from crawling can still appear in search. Submit your sitemap in Google Search Console and use URL Inspection to check your home page and other important pages.
Speed and images
Measure the speed of the home page and of a product page through the free PageSpeed Insights tool, on the mobile tab. The usual reason for a slow site on delivery day is heavy photos uploaded straight from the camera. We covered this in our article on why your website loads slowly. Right after handover it takes a few hours to fix; six months later, with the catalog filled in, there is noticeably more work.
Analytics and lead tracking
The analytics tracking code has to be present on all pages without exception. If event setup was part of the contract, confirm separately that analytics records form submissions. Otherwise you will see traffic but no inquiries, and the advertising budget will be spent blind. Ask for a test inquiry to be sent and shown in the report.
Extra checks for an online store
A store has what a brochure site lacks: payments, stock and delivery. Checking them takes several hours, and cutting that short is risky. More about how we build stores is on our e-commerce website development page.
- A full test order. On a staging copy of the store, go through product search, filters, cart and checkout. Check payment and refund in the payment provider’s test mode.
- Order emails. The notification has to reach the buyer and the manager. Compare the total, the company name and the contacts, and check that the message stays out of spam.
- Shipping and payment. Check how the site calculates delivery to different cities, along with weight limits, the free shipping threshold and every payment method on the site.
- Stock levels. An item that is out of stock should not be orderable. Look at how a product page behaves with zero stock.
- Sync with your back office. If the store is tied to accounting software or a marketplace (Amazon, Etsy or a regional equivalent), ask for a full sync cycle while you watch, with the result shown in both systems.
Also agree on who fills the catalog. The estimate has to say how many product pages the agency creates and how many you create, and in what form photos and descriptions are handed over. This boundary is blurred more often than any other, and it is a common reason stores launch late.
Documents and files you take away
Next comes the paperwork. The list is short, and gathering it six months later is often impossible.
| What to get | What it gives you |
|---|---|
| List of all access credentials | A register of services and account owners, with passwords and recovery codes kept in a password manager |
| Source code and a database copy | Lets you hand the project to another team or restore the site after a failure |
| Design files | For new pages, banners and print materials in the same style |
| Administrator guide | Your staff can add news, products and texts on their own |
| List of paid services | Shows what is charged, when, and from whose card |
| Warranty terms | Makes clear which fixes are free and how fast they are delivered |
In the contract, spell out what counts as a developer’s error and what counts as a new task with its own price, how quickly free fixes are made, how long the warranty runs, and the rate for work beyond it. Otherwise any request after delivery can turn into an argument.
Where owners go wrong most often
Mistakes at handover repeat from project to project. These cost owners the most.
- Sign-off happens on trust. The money is transferred, the contractor is free, and the list of unfinished items stays a verbal agreement. Replies get slower every week.
- The site is accepted from the developer’s screen. On that computer everything works, because the passwords and the cache are saved there. Your customer arrives from another device and sees the site differently.
- Only the home page gets attention. It gets polished, while the contacts page or a service page stays in draft condition.
- The phone gets ignored. Most visitors arrive on a smartphone, and that is where most of the defects turn up.
- Nobody asks who runs the site next. After delivery the project needs updates, backups and monitoring. Arranging that before signing is easier.
One more signal is a contractor reluctant to walk the list with you. A good agency offers that meeting itself and brings its own checklist. Other warning signs are gathered in our article on how to choose a web agency.
Conclusions
Handover takes one working day and saves you from the most expensive problems: a lost domain, vanished analytics, a site that search engines never see. First take the access credentials and verify them personally. Then walk the site as a customer would, from a phone. After that comes the technical part and, for a store, a full order cycle with payment. At the end you collect the documents and get the warranty terms in writing.
As soon as the site is delivered, the project moves into a stage where response speed and regular maintenance matter. What to do from there we described in our article on the first 90 days after launch. The minimum for any site is updates, backups, uptime monitoring and a person you can write to on a working day.
For routine care after launch, the Maintenance plan starts from $150 a month. It includes CMS and plugin updates, backups, security, uptime monitoring, domain and SSL expiry checks, plus 2 hours of edits a month. We confirm the price after reviewing the site.
If you need ongoing improvements, the Basic plan at $400 a month includes 20 hours in total for maintenance, edits and improvements. Busy stores take larger packages: $800 a month for 40 hours and $1,600 a month for 80 hours. Isolated tasks without a plan are billed hourly, at $25/hr. The scope of each option is listed on the project support and development page.
If you are accepting a site now and have doubts about its quality, use the form at the bottom of this page to send us the site address. We will review the project and put together a list of what to ask the contractor for before you sign.